Quality is built on strength, and professionalism is demonstrated through case studies.
The Datang Dali 200MW agricultural-solar complementary power generation project is located in Guanchi Town and Weilin Town, Dali County, Weinan City, Shaanxi Province. The first phase of construction includes an AC-side installed capacity of 200MW, along with a 110kV step-up substation connected to the Shayuan substation via a single 110kV overhead line. The power station's first-year on-grid power generation is 334,347,900 kWh. Over its 20-year operational period, the average annual power generation is projected to be 315,131,200 kWh, with an annual utilization of 1312.98 hours.
The project is located in Jiashi County, Kashgar Prefecture, Xinjiang. The installed capacity of the photovoltaic AC side is 600 MW and the installed capacity of the DC side is 754.4628 MW, with a capacity ratio of 1.25. The 35 kV line of the photovoltaic field is connected to the newly built Tarim Oilfield Kashgar Yuepuhu 220 kV step-up substation.
The project is located in Jiaokou Town and Zhangjiatan Town, Yanchang County, Yan'an City, Shaanxi Province. The wind farm site covers an area of approximately 210 square kilometers and will be equipped with 27 wind turbine generators of 5.56 MW each, with a total installed capacity of 150 MW.
The project makes reasonable use of the rooftops of 20 factory buildings in the industrial park, adopts LONGi's high-efficiency monocrystalline all-black modules, and operates on a self-consumption and surplus power grid connection model. It is expected to generate 13 million kWh of green electricity annually, reducing carbon dioxide emissions by about 10,000 tons.
The distributed photovoltaic project of the third phase expansion project of Xi'an Xianyang International Airport is distributed in 6 areas. All of them adopt low-voltage grid connection. The photovoltaic adopts the form of BAPV (Building-Based Photovoltaic), which uses roofs and carports to generate electricity using photovoltaic modules. The surplus (energy storage) is fed into the grid. The photovoltaic is equipped with a monitoring system, with a total installed capacity of approximately 13.80MW and supporting energy storage equipment.
The Baijiakou Station of Xi'an Metro Line 8 features an integrated "P+R (Park and Ride) + Photovoltaic, Energy Storage and Charging" demonstration power station, the first green transportation energy replenishment hub in Lianhu District that integrates photovoltaic power generation, electrochemical energy storage, smart fast charging, and convenient services. It aims to create a one-stop travel service combining "metro + parking + charging," contributing to the construction of Xi'an's "rail-based metropolitan area."
This project is located in Guzhen Town, Guanlu Town, and Jiaoxie Town of Linwei District, Weinan City, with a planned capacity of 200MW. It plans to install 32 onshore wind turbine generators, each with a capacity of 6.25MW and a hub height of 180 meters. The on-site power collection lines are designed with a 35kV voltage level, and the entire site is divided into 7 collection units. The lines are laid by direct burial of cables and uniformly connected to the 35kV power collection line switchgear of the substation, achieving safe, efficient, and orderly collection of wind power.