Project Cases

Quality is built on strength, and professionalism is demonstrated through case studies.

Construction of centralized photovoltaic power generation projects 大唐大荔200MW农光互补发电项目PC项目施工

Construction of the PC project for the Datang Dali 200MW agricultural-solar hybrid power generation project

The Datang Dali 200MW agricultural-solar complementary power generation project is located in Guanchi Town and Weilin Town, Dali County, Weinan City, Shaanxi Province. The first phase of construction includes an AC-side installed capacity of 200MW, along with a 110kV step-up substation connected to the Shayuan substation via a single 110kV overhead line. The power station's first-year on-grid power generation is 334,347,900 kWh. Over its 20-year operational period, the average annual power generation is projected to be 315,131,200 kWh, with an annual utilization of 1312.98 hours.

Construction of centralized photovoltaic power generation projects 塔里木油田伽师县60万千瓦光伏发电EPC总承包项目

Tarim Oilfield Jiashi County 600MW Photovoltaic Power Generation EPC General Contracting Project

The project is located in Jiashi County, Kashgar Prefecture, Xinjiang. The installed capacity of the photovoltaic AC side is 600 MW and the installed capacity of the DC side is 754.4628 MW, with a capacity ratio of 1.25. The 35 kV line of the photovoltaic field is connected to the newly built Tarim Oilfield Kashgar Yuepuhu 220 kV step-up substation.

Construction of centralized wind power projects 中电工程陕西延安交口镇15万千瓦风电项目

China Power Engineering Corporation Shaanxi Yan'an Jiaokou Town 150MW Wind Power Project

The project is located in Jiaokou Town and Zhangjiatan Town, Yanchang County, Yan'an City, Shaanxi Province. The wind farm site covers an area of ​​approximately 210 square kilometers and will be equipped with 27 wind turbine generators of 5.56 MW each, with a total installed capacity of 150 MW.

Construction of distributed photovoltaic power generation projects 西安吉利零部件产业园 12MW分布式光伏发电项目施工

Construction of the 12MW Distributed Photovoltaic Power Generation Project at Xi'an Geely Auto Parts Industrial Park

The project makes reasonable use of the rooftops of 20 factory buildings in the industrial park, adopts LONGi's high-efficiency monocrystalline all-black modules, and operates on a self-consumption and surplus power grid connection model. It is expected to generate 13 million kWh of green electricity annually, reducing carbon dioxide emissions by about 10,000 tons.

Construction of distributed photovoltaic power generation projects 西安咸阳国际机场五号航站楼分布式光伏发电项目施工

Construction of distributed photovoltaic power generation project at Xi'an Xianyang International Airport Terminal 5

The distributed photovoltaic project of the third phase expansion project of Xi'an Xianyang International Airport is distributed in 6 areas. All of them adopt low-voltage grid connection. The photovoltaic adopts the form of BAPV (Building-Based Photovoltaic), which uses roofs and carports to generate electricity using photovoltaic modules. The surplus (energy storage) is fed into the grid. The photovoltaic is equipped with a monitoring system, with a total installed capacity of approximately 13.80MW and supporting energy storage equipment.

分布式光伏发电项目施工 西安白家口地铁站分布式光伏工程

Xi'an Baijiakou Metro Station Distributed Photovoltaic Project

The Baijiakou Station of Xi'an Metro Line 8 features an integrated "P+R (Park and Ride) + Photovoltaic, Energy Storage and Charging" demonstration power station, the first green transportation energy replenishment hub in Lianhu District that integrates photovoltaic power generation, electrochemical energy storage, smart fast charging, and convenient services. It aims to create a one-stop travel service combining "metro + parking + charging," contributing to the construction of Xi'an's "rail-based metropolitan area."

新能源工程施工 渭南泰安达临渭区管路20万千瓦风电EPC项目集电线路工程

Weinan Tai'an Dalinwei District 200MW Wind Power EPC Project Collection Line Engineering

This project is located in Guzhen Town, Guanlu Town, and Jiaoxie Town of Linwei District, Weinan City, with a planned capacity of 200MW. It plans to install 32 onshore wind turbine generators, each with a capacity of 6.25MW and a hub height of 180 meters. The on-site power collection lines are designed with a 35kV voltage level, and the entire site is divided into 7 collection units. The lines are laid by direct burial of cables and uniformly connected to the 35kV power collection line switchgear of the substation, achieving safe, efficient, and orderly collection of wind power.